LAKE CHARLES
Channel Service: OPEN
Pilot Service: OPEN
Tug Availability: 5 TUGS
Cameron Ferry: OPEN
Notes: Open 24/7, however, for routine maintenance, it is out of service nightly from 12:00 AM to 1:30 AM.
===================================================================
Inbound Deep Draft Pilot Boarding Windows:
06/0500 TO 06/1115 ** 07/0545 TO 07/2115 ** 08/0630 TO 08/2130
Maximum Channel Draft: 40'00” FW
Max Terminal Drafts:
Alcoa 32’00” FW
Bulk Terminal 1 Old 40’00” FW EFFECTIVE FEB. 14, 2022
Bulk Terminal 1 New 40’00” FW EFFECTIVE FEB. 14, 2022
CITGO “B” Dock 39’09” FW EFFECTIVE MARCH 08, 2024
CITGO “C” Dock 39’06” FW EFFECTIVE MARCH 08, 2024
CITGO “D” Dock 34’06” FW EFFECTIVE MARCH 08, 2024
CITGO CLIFTON RIDGE 36’06” FW EFFECTIVE SEPTEMBER 03, 2024
CITGO C.R. BARGE DOCK 13’00” FW EFFECTIVE MARCH 12, 2024
Phillips 66 Clifton Ridge 40’00” FW
Phillips 66 Refinery Dock #3 42’00” BRACKISH WATER | CONTROLLING DEPTH
Port of Lake Charles City Docks 35’00” FW
Port of Lake Charles City Dock #8 40’00" FW
Westlake Chemical A Dock 41’00” FW EFFECTIVE 9/1/23
Westlake Chemical C Dock 42’00” FW EFFECTIVE 9/1/23
Westlake Styrene/CII 35’00” FW
Ventur Global LNG 40’00” FW
A2 INNER ANCHORAGE 40’00” FW
A4 INNER ANCHORAGE 40’00” FW
I-210 BRIDGE 135 FT (+/- TIDE)
Traffic Notice:
-ABANDONED ANCHOR CHAIN IN POSITION L 29-17.8N, LN 093-11.75W, BEARING 150 / 2.6NM FROM CC. DO NOT ANCHOR LESS THAN 3.5 MILES S.E. OF CC
PILOT DELAYS OF 2025
January 05, 2025 Sunday
2000 – Pilot service suspended due to rough weather offshore
January 6, 2025 Monday
0400 – Pilot service resumed