Daily Update

Northern California

October 04, 2024

Notices

Please find the attached updated Controlling Depth Letter for October 2, 2024.  Kindly make note that there are changes to the Maneuvering Areas and All Berths.
 
Please note – the following are changes in depth from the last controlling depth letter
  • Berth 1 - minus -4.1 ft / Maneuvering Area minus 0.7 ft
  • Berth 2 – minus -2.6 ft
  • Berth 3 – minus -1.7 ft
  • Berth 4 – minus -2.2 ft / Maneuvering Area minus 0.6 ft
 
The RLW Annual Dredge Maintenance Project is scheduled to commence on 14-Oct-2024. 

Attachments

  • RLW CDL Oct_02_2024.pdf(209 KB )

Disclaimer: For quality assurance purposes please note well that while the information contained in this website is regularly vetted for accuracy it is not intended to replace the local knowledge or expertise pertaining to port conditions of our marine operations personnel.

Access our team on the go

There are two ways to ensure you can always reach us.

Mobile App

Download our mobile app to search our corporate directory and contact us.

Print Directory

Download and print out our foldable portable directory for quick access.

News Bulletin

Sign up to receive updates about port conditions, important notices, and other news.