Port Alert

New Orleans / Mississippi River

March 19, 2025

Notices

Please note the below regarding the channel closure at MM. 0.0 – MM 2.0 AHOP for removal of a dredge discharge pipeline that’s crossing the main navigation channel.  As we understand there will be another closure required.  We will pass along further information once received. .

The contractor has advised the channel will open at 20:00 as scheduled.  During the removal operation, half of the pipe broke and fell back to the bottom of the river in the original location. 

It appears that another river closure between Mile 0 and Mile 2 will be required later this week, probably Saturday.  We will advise once confirmation is received. 

Please continue to monitor your email for updates. 

Disclaimer: For quality assurance purposes please note well that while the information contained in this website is regularly vetted for accuracy it is not intended to replace the local knowledge or expertise pertaining to port conditions of our marine operations personnel.

Access our team on the go

There are two ways to ensure you can always reach us.

Mobile App

Download our mobile app to search our corporate directory and contact us.

Print Directory

Download and print out our foldable portable directory for quick access.

News Bulletin

Sign up to receive updates about port conditions, important notices, and other news.